China’s human genetic resources (HGR) rules do not create one universal “approval before first patient” step. The route depends on what the protocol collects, where samples are held and analyzed, whether the trial is an international collaboration, and whether materials or genetic information will be made available abroad. The National Health Commission’s revised Implementing Rules, Order No. 16, took effect on 5 November 2026 and replaced the 2023 rules.
Before opening a China site, sponsors should map the sample and data journey against the clinical-trial filing conditions, the separate HGR approval tracks, and any outbound transfer. This checklist focuses on the decisions to document before first-patient-in (FPI), the evidence needed to support them, and the changes that should trigger a fresh review. It is a planning aid; the applicable route turns on the project’s actual facts and current NHC requirements.
Start with the material and data, not the sponsor’s label
Order No. 16 defines HGR materials to include cells, whole blood, tissue, semen, cerebrospinal and other listed cellular materials, and genetic material derived from them. It excludes non-cellular secretions and fluids, swabs, and samples such as urine, feces, serum, and plasma that may contain only tiny amounts of shed, residual, or free cells or nucleic acid. HGR information covers data generated from HGR materials, including nucleic-acid sequence information such as genomic, transcriptomic, and epigenomic sequences and associated disease information. Pure clinical, imaging, protein, and metabolic data are excluded from that definition. These boundaries are important, but a sample or dataset should be classified from its actual contents and workflow, not its label in a protocol or vendor catalogue.
For each protocol procedure, record the specimen, collection site, processing steps, derived analytes, storage location, testing laboratory, data generated, access permissions, and final disposition. Ask the laboratory to describe whether an assay produces genetic sequence information and whether a nominally excluded sample contains or yields HGR materials in the planned process. Keep clinical datasets distinct from sequence data while checking whether records can be linked to sequence information. This inventory gives regulatory, clinical, privacy, and vendor teams a common factual baseline.
Choose the China clinical-trial route before FPI
For an international collaborative clinical trial conducted to obtain Chinese marketing authorization for a drug or medical device, the revised rules provide a filing route where the HGR materials are collected at a medical and health institution in China, are not taken out of China, and are tested, analyzed, and any remaining materials handled at that institution or at a domestic entity designated by the clinical-trial protocol or agreement. The filing is made to the NHC before the trial starts. It calls for the parties’ legal-entity documents, a clear and lawful research purpose and reasonable term, informed-consent text, ethics review evidence, the international collaboration agreement, and the drug regulator’s clinical-trial approval, notice, or filing record.
This is a conditional route, not a blanket exemption for every multinational study. Confirm each condition in the protocol, consent, laboratory and sample-management plans, and executed agreements. The Chinese and foreign parties jointly apply and make commitments about the truth, accuracy, and completeness of the filing. For a multicenter study, the sponsor or lead institution submits for the study as required; centers cannot divide the same study into smaller applications to avoid review. Collect participating centers’ ethics documents and undertakings, and define who controls vendors, samples, and records.
The rules separately state that the exploratory research portion of a clinical trial for Chinese marketing authorization does not need a separate international collaborative scientific-research approval application. That provision should be read in its stated context. It does not erase the clinical-trial filing conditions, outbound-material approval, information-reporting requirements, ethics review, consent, or other applicable rules.
Identify activities that still need an HGR approval
International collaborative scientific research using China’s HGR generally requires NHC approval. The application includes the legal-entity documents, a clear and lawful research plan with a reasonable duration, consent text, ethics review evidence, and the collaboration agreement, including intellectual-property ownership and benefit-sharing terms where relevant. Foreign organizations that use China’s HGR for research must work with a Chinese institution and comply with Chinese law.
Collection has its own threshold. NHC approval is required for collection of more than 10,000 cases for large-scale population studies, including cohort, cross-sectional, clinical, or physical-characteristic studies, and for collection involving officially published lists of important genetic families or specific regions. The rule excludes HGR collection involved in clinical trials conducted to obtain Chinese marketing authorization for relevant drugs or medical devices from that particular large-scale collection trigger. It also bars splitting a collection to avoid authorization. A protocol team should therefore distinguish a qualifying marketing-authorization trial from a separate observational or population-research component rather than treating every study procedure as part of one category.
Research-only preservation that qualifies as HGR preservation to provide a research platform requires NHC approval. The rules exclude certain storage from the definition, including temporary storage after laboratory testing when required by law or the clinical research plan, storage primarily for clinical diagnosis or teaching with research as an additional purpose, and storage for production of already marketed drugs or devices. Document the purpose, duration, location, access, and disposition of retained samples so that temporary operational storage is not silently turned into a long-term research repository.
Separate a material shipment from remote data access
Sending, mailing, or carrying HGR materials outside China requires NHC approval and an HGR materials exit certificate for customs procedures. The application materials include a reasonable research plan, signed consent, ethics evidence, the collaboration agreement, an agreement on handling remaining samples, and proof of lawful source. Where an approved international collaboration includes a material shipment, the outbound plan may be included for combined review. A plan to sequence samples in China does not itself authorize a later shipment of aliquots or residual material.
Genetic information supplied or opened for use to a foreign organization, foreign individual, or foreign-controlled entity follows a separate process. The Chinese information owner must make a prior report to the NHC and submit a data backup, including the purpose and use, backup status, recipient information, and potential-risk assessment. The rules specify exceptions: for example, use of already public HGR information does not require that report; certain information produced under an approved collaboration or filed clinical trial can be shared with the named recipient when the agreement and application already cover that use; and information for overseas drug or device registration may be covered when it was identified in the filed clinical-trial application. Publication or conference disclosures have a separate submission route through the National Bioinformation Center before publication or the meeting.
Do not assume that remote access, a foreign cloud environment, a central laboratory, or a vendor’s standard terms are irrelevant because no tube crosses a border. Trace who can view, query, download, analyze, or onward-transfer the genetic information; identify the data owner and recipient; and compare the actual use with the filing or prior report. A change in the reported purpose or recipient must be reported again before the change is implemented. Also assess other applicable data, privacy, cybersecurity, clinical-trial, and export-control rules independently.
Build a reviewable FPI file and change-control trigger
A practical FPI file can be organized around five records:
- Material and data map: protocol procedures, sample types, derived genetic data, sites, laboratories, storage, recipients, access, and disposition.
- Route decision: whether the activity is an international collaborative clinical-trial filing, international collaborative scientific-research approval, collection or preservation approval, or another route; record each condition and the facts supporting it.
- Participant and ethics record: approved consent language that accurately describes purpose, use, privacy protections, voluntary participation and withdrawal, plus ethics approvals from the relevant parties.
- Contract and vendor controls: named Chinese and foreign parties, permitted tasks, sample and data access, local laboratory and storage requirements, security measures, residual-sample handling, records and backups, intellectual-property and benefit-sharing terms where relevant, and audit/change-notice duties.
- Submission evidence: approval, completed filing or prior-report confirmation, supporting materials, NHC correspondence, and a named owner responsible for monitoring commitments.
Before FPI, compare the approved or filed plan with the final protocol, consent, site list, laboratory manual, data-management plan, vendor contracts, and transfer settings. The revised rules require timely approval or filing changes for significant changes such as the HGR source, research purpose or content, sample type, quantity, use, residual-material handling, sponsor, lead institution, contract research organization, or third-party laboratory. Other specified changes require a written explanation and supporting documents. Put these events into the study’s change-control workflow so that a vendor or protocol amendment does not outrun the regulatory record.
The NHC’s revised rules took effect on 5 November 2026. Because the service system and guidance can change, the sponsor and Chinese lead institution should confirm the current application route and required forms with the NHC system before submission. The key operational question is not simply whether the study is “global”; it is whether the actual collection, collaboration, storage, analysis, and access plan matches the regulatory route documented before the first China participant is enrolled.
Primary sources
- NHC Order No. 16, Implementing Rules for the Regulation on the Administration of Human Genetic Resources (promulgated and effective 5 November 2026; see Articles 3, 16–20, 21–22, 25–42).
- Regulation on the Administration of Human Genetic Resources (State Council Order No. 717, as amended).
- NHC English summary of the revised rules (12 November 2026).


