Semiconductor work can expose more than a design file. A supplier or manufacturing partner may need a bounded set of process recipes, tool settings, yield data, failure analysis or software access to perform a specific task. Before sharing, identify the information, its owner, the purpose, the recipients and the controls that will remain in place.
China’s Anti-Unfair Competition Law defines a trade secret by its non-public character, commercial value and corresponding confidentiality measures. A label or contract alone cannot establish that every item qualifies. Treat the legal analysis, contract, technical controls and evidence of actual access as one protection plan.
Map the information before a partner receives it
Build an information register for the proposed work. Separate public material, partner-specific deliverables and restricted know-how. Record the file or system, technical owner, source, business value, recipients, permitted purpose, export-control review and approved retention period. Include oral explanations, remote access, samples, debug logs and support sessions.
For a semiconductor project, the inventory may include process recipes, equipment configurations, process windows, yield-learning data, mask or layout files, process design kit material, failure-analysis procedures, reliability models, diagnostic software and capacity or supplier data. Whether a particular item is protectable or controlled depends on its facts and applicable law.
Decide what to disclose, and in what form
- Give the partner only the technical detail needed for the defined task. Use a test vector, interface specification, limited sample or controlled output when it can answer the engineering question without exposing the underlying method.
- Separate customer-owned, supplier-owned, jointly developed and pre-existing materials in the project record. Identify who may use each result and for what purpose.
- Keep sensitive files in a controlled repository. Use named accounts, time-limited access, least-privilege permissions, download restrictions where workable, logging and revocation procedures.
- Set rules for clean-room visits, photography, removable media, personal devices, remote support, subcontractors and the return or deletion of materials.
- Review technical disclosures, software and assistance for export-control issues before access is enabled. An NDA does not authorize a controlled transfer.
Build the contract around the actual work
Use an agreement signed by the correct legal entities before disclosure. Define confidential information and permitted purpose clearly; state use and onward-disclosure limits; address approved recipients, security incidents, return or deletion, audit cooperation and remedies in a way that fits the project and applicable law.
In the supply, foundry or OSAT agreement, schedule background technology, project deliverables, improvements, tooling, data, test results and derivative materials. Specify how each may be used, disclosed and licensed. Make sure purchase orders, technical specifications, joint-development terms and supplier platform terms do not quietly conflict with the principal agreement.
Use mutual confidentiality terms where both parties will disclose information. Any non-use or non-circumvention language should be reviewed for scope, enforceability and consistency with the commercial relationship. Do not rely on a generic template to resolve ownership of inventions or technical improvements.
Make confidentiality measures visible in practice
China’s 2025 amended Anti-Unfair Competition Law, effective October 15, 2025, describes a trade secret as technical, business or other commercial information that is not generally known, has commercial value and is subject to corresponding confidentiality measures. Supreme People’s Court rules identify measures such as confidentiality agreements, employee and supplier instructions, controlled premises, classification or isolation, and limits on access, storage or copying. The court evaluates the measures in context; build controls that correspond to the information and the risk.
- Use consistent labels and a record that links each restricted item to its handling rules.
- Limit access to named roles and review access when assignments change.
- Train employees and approved partners on use restrictions, onward disclosure and incident reporting.
- Keep visitor, download, transfer, backup and deletion records proportionate to the project.
- At exit, disable access, recover devices or materials, preserve relevant evidence and document return or deletion requests.
Respond to a suspected leak
Preserve access logs, repository versions, emails, device records and relevant contract versions. Restrict further access where appropriate and involve security, engineering and legal teams. Record what information may have left, who could access it, and the basis for each conclusion. Do not alter source records or confront an outside party in a way that compromises evidence. Counsel can assess notices, preservation steps, regulatory issues and available remedies for the particular facts.
Pre-disclosure release checklist
- The purpose, work package, data owner and receiving legal entity are identified.
- The minimum technical data set and approved access method are recorded.
- Ownership, license, improvements and permitted-use terms align across the signed agreements and purchase documents.
- Export-control review covers hardware, software, technical data and assistance as relevant.
- Named-user permissions, logging, retention and exit steps are configured.
- Subcontractors, sites, devices and onward transfers are addressed.
- An incident contact and evidence-preservation path are known to both teams.
Primary sources and related guides
- China National Intellectual Property Administration: 2025 amended Anti-Unfair Competition Law
- Supreme People’s Court: judicial rules on civil trade secret disputes
- China trade secrets framework
- China NNN agreements in manufacturing
- Semiconductor equipment export controls
- China semiconductors hub
Sources checked November 29, 2026. General information only. Protection, ownership and control questions depend on the information, contract, parties and transfer route; obtain project-specific advice before disclosure.