When a shipment fails a buyer’s quality check, the first question is often contractual: what did the supplier promise, when did the buyer inspect, and how was the defect reported? For a business-to-business sale governed by Chinese law, the Civil Code links the seller’s quality obligation to the agreement and sets rules for inspection and notice. Those steps can affect whether the parties are treated as having accepted the goods’ quantity or quality.
This guide focuses on a buyer’s claim against its seller for non-conforming goods, not a consumer claim or a personal-injury product-liability action. The contract and purchase order should be read first. Preserve the specification, delivery, testing, and notice records together, then select a remedy that fits both the contract and the defect. If a foreign element is involved, governing law and dispute forum are separate threshold questions.
Start with the contract’s quality promise
The seller must deliver goods meeting the quality requirements agreed by the parties. If the contract incorporates a product description, technical specification, drawing, sample, standard, or quality statement, identify the exact version and whether it applies to this order and batch. The Civil Code provides a default quality standard when the parties’ requirement is missing or unclear and cannot be resolved from the contract or their subsequent agreement. A broad label such as “commercial grade” may leave room for dispute; a measurable acceptance criterion is easier to compare with test results.
Build a claim around the difference between the agreed requirement and the delivered goods. Record the purchase order and amendments, approved samples, production or inspection records supplied by the seller, packaging and lot identifiers, delivery documents, and the buyer’s own test method and results. Keep the allegedly defective units and relevant packaging in their received condition where practicable, and log who handled or tested them. These records help connect a test result to the goods delivered under the disputed order.
Calendar inspection and notice dates
Check the inspection clause before the shipment arrives. Under the Civil Code, a buyer inspects within the agreed inspection period; if no period was agreed, inspection should be prompt. When a period is specified, the buyer should notify the seller within that period of a quantity or quality mismatch. If no period was agreed, notice is due within a reasonable time after the buyer discovers or should discover the mismatch, and the Code generally treats goods as conforming if notice is not given within a reasonable period or within two years after receipt. A stated quality-guarantee period applies instead of that two-year period. The Code also removes the ordinary notice-time limit where the seller knew or should have known that the goods did not conform.
A short inspection window may not settle every issue. If the goods’ nature and ordinary transaction practice make a full inspection impossible within the agreed period, the Civil Code treats that period only as the time to object to apparent defects. Where no inspection period was agreed, a signed delivery or confirmation document listing quantity, model, or specifications can support a presumption that those matters and outward defects were inspected, although evidence may rebut it. Do not assume that a receiving stamp proves full technical acceptance—or that it preserves every later claim. Read the actual document and contract together.
Send a dated written notice that identifies the order, batch or serial numbers, the specific requirement not met, the test or inspection result, the quantity affected, and the remedy requested. Attach the supporting records and retain proof of delivery and the supplier’s response. If the cause is disputed, invite the supplier to inspect or agree a testing method while preserving the goods; make clear what is known and what remains under investigation. Prompt, specific notice is a practical way to meet the contract and create a reliable record.
Match the remedy to the breach
First apply any valid remedy and cure terms in the contract, including required notice channels, cure steps, replacement timing, return logistics, and allocation of testing costs. For non-conforming goods, the Civil Code allows the buyer to seek breach-of-contract remedies under Articles 582 to 584. If the agreement does not specify the remedy, or the term cannot be clarified, the buyer may reasonably select a response that fits the nature of the goods and the loss, such as repair, reworking, replacement, return, or a price reduction. Additional loss after performance or corrective action may also be recoverable if proved.
If the quality failure makes the contract’s purpose unattainable, the Code separately permits the buyer to refuse acceptance or terminate the contract. That is a fact-dependent threshold; a minor or repairable deviation does not automatically justify cancellation of the whole order. For a damages claim, preserve evidence of the loss and its connection to the breach. The Civil Code measures recoverable loss by the harm caused, including benefits that would have been obtained, subject to the amount the breaching party foresaw or should have foreseen when contracting.
Use the dispute to improve the next order
For repeat purchases, state the governing specification and its revision, inspection method and sampling plan, when the inspection clock starts, how latent defects are handled, who receives notices, and the time allowed for cure. Set out the available remedies and practical steps for segregation, return, replacement, or reinspection. Ensure the supplier’s quality promise and the buyer’s downstream commitments can be reconciled before signing.
This framework concerns contractual conformity in a B2B sale governed by Chinese law. A claim involving consumer rights, physical injury, a statutory product-safety duty, or a foreign-law clause may require a different analysis. In a live dispute, the signed contract, transaction records, defect evidence, and agreed forum determine the next step.