Fit-out work creates one of the most practical pressure points in a commercial lease: the tenant needs a usable site, the landlord wants control over alterations, and both parties need a clear record of the premises before work starts. Disputes often turn on what was approved, which party was responsible for a repair, and what condition the tenant must leave behind.
China’s Civil Code addresses delivery, agreed use, repairs, tenant improvements, and return of leased property, while the lease can allocate many operational details. This guide follows the premises from handover through construction and repair to move-out, with a focus on written approvals and condition records for foreign business tenants.
Start with the condition the tenant is receiving
Before taking possession or allowing contractors onto the site, create a joint record of the area being delivered, existing damage, fixtures, building systems, keys, access cards, and meter readings. Use dated photographs or video that show each room and any specific defect. Attach a floor plan identifying the leased area and list equipment or furniture that belongs to the landlord.
The Civil Code requires the lessor to deliver the leased property as agreed and keep it fit for the agreed use during the term. Put the relevant delivery standard in the lease or handover record: which services must work, what defects may remain, who will fix them, and the deadline. If rent or the fit-out period depends on delivery, say which checklist items must be completed before the rent-start date.
Describe the work and secure written consent
List the planned alterations in a marked plan and work schedule. Identify walls, ceilings, flooring, wiring, plumbing, ventilation, signs, equipment, and other additions that will be installed or removed. State who reviews drawings, who may approve changes, and how the parties will record approval before any work outside the agreed scope begins.
The Civil Code allows a tenant to improve leased property or add fixtures with the landlord’s consent. If the tenant makes improvements or additions without consent, the landlord may seek restoration or compensation. Make approval specific enough to identify the work and the version of the plans. Keep the written approval with any later change order so that on-site instructions do not become the only record of the agreed scope.
Consent from the landlord is one part of the review. Building-management rules and applicable construction, safety, fire-protection, environmental, or operating-approval requirements may also affect the work. Identify which party will check and obtain each approval that applies to the particular site and activity. Do not assume that the lease or a landlord’s consent replaces a required authority process.
Allocate responsibility during construction
Use a fit-out schedule to set access hours, delivery routes, noise limits, contractor registration, site protection, waste removal, utilities, inspections, and the person who may issue site instructions. Identify who hires and pays each contractor, who carries required insurance, who is responsible for damage to common areas, and who coordinates with building management. Specify how delays caused by incomplete landlord work, restricted access, or a requested design change affect the handover and rent-start timetable.
Keep a change log that records the request, the approving person, cost and time impact, the final drawing, and the date the change was completed. At completion, use a joint inspection record to note outstanding defects and agreed corrective work. Retain invoices, test reports, permits or approvals that were required, inspection notes, and written sign-off. These documents help distinguish authorized work from a later alteration or a pre-existing condition.
Set a repair process for the operating period
The Civil Code generally places the maintenance duty on the lessor unless the parties agree otherwise. When a repair is needed, the tenant may ask the lessor to arrange it within a reasonable time. If the lessor does not do so, the tenant may carry out the repair and seek the reasonable expense under the Code. If a repair affects the tenant’s use, the Code provides for a corresponding rent reduction or extension of the lease term; it also excludes the lessor’s duty where the need for repair results from the tenant’s fault.
The lease should turn those rules into a workable notice procedure. Give the tenant a reliable contact for urgent and routine issues, require written notice with photographs where practical, set response and access arrangements, and describe how emergency work will be authorized. Identify which routine tasks the tenant will perform and which building or structural repairs the landlord will handle. If the contract reallocates repair duties, define the boundary rather than relying on general terms such as “maintenance” or “upkeep.”
For a repair that interrupts business, record the affected area, dates, access restrictions, mitigation steps, and the parties’ written agreement on any temporary arrangement. Avoid assuming that every disruption creates the same remedy; the contract, cause of the problem, and effect on use may matter.
Track equipment, additions, and normal wear
Maintain an inventory of tenant-owned equipment and landlord fixtures, with serial numbers or photographs for items that may be disputed later. Record when an item is installed, whether it is removable, and whether removal requires patching or other work. The lease should say what happens to approved improvements at expiry: whether they stay, may be removed, or must be restored, and which party pays for the agreed work.
The Civil Code distinguishes ordinary wear from damage caused by use outside the agreement or the nature of the property. A tenant using the property as agreed is not liable for ordinary wear and tear. If use outside the agreed method causes damage, the lessor may have termination and compensation rights. Describe the permitted use and any operating limits that protect the premises, then preserve evidence of how the space was actually used and maintained.
Plan the final inspection before the lease ends
Agree on the handback standard early. The Civil Code requires return of the property in the condition resulting from use as agreed or consistent with its nature. The contract can clarify which approved alterations remain, which equipment must be removed, what restoration is required, and how ordinary wear, old defects, and tenant-caused damage will be assessed.
Schedule a joint inspection with enough time to complete agreed corrections before the expiry date. Compare the final condition with the signed opening record and approved fit-out plans. List each disputed item separately, attach current photographs, and record whether the tenant will repair it, the landlord will complete the work, or the parties reserve the issue for later discussion. Record key, card, and meter returns and the date possession is delivered.
Keep the lease, plans, approvals, initial and final condition reports, repair notices, change orders, and payment evidence together. A dated handover record is useful for deposit reconciliation and later discussions about defects or restoration, but it does not predetermine whether a party has met its legal or contractual obligations.
Fit-out and handback file checklist
- Plan identifying the leased space, landlord fixtures, and initial condition.
- Signed delivery record with dated photos, meter readings, keys, and open defects.
- Written landlord consent and any applicable building or authority approvals for planned work.
- Fit-out drawings, contractor details, change log, invoices, inspection notes, and completion record.
- Repair notices, access records, emergency-work approvals, and evidence of any effect on use.
- Agreed restoration schedule, final inspection, equipment inventory, and possession-return receipt.
This article is general information, not legal advice about a particular premises or construction project. Repair allocation, approval requirements, and handback obligations depend on the lease, the property, and applicable local rules. Confirm the requirements for the specific site before work begins.


