A factory or warehouse lease is useful only if the site can be lawfully delivered and used for the tenant’s planned operation. Before signing, confirm who has authority to lease the premises, what building and land records identify the space, whether the permitted use fits the intended activity, and what condition and services will actually be handed over. A lease clause cannot by itself cure a defect in title, construction status, or a required operational approval.
For foreign manufacturers and logistics operators, the most practical protection is a verifiable site file: plans and measurements, authority documents, fire-safety information, utility capacity, condition photographs, repair responsibilities, fit-out consent, and an agreed return standard. This guide focuses on that pre-signing and handover process, with contract terms tied to the facts the parties can inspect and record.
Verify the landlord’s authority and the exact premises
Identify the proposed lessor and compare it with the property records. Ask for the real-estate ownership certificate or other lawful-source documents, the site plan, the floor or parcel description, and the lessor’s business registration and signing authority. If the lessor is not the owner, trace the authority through the head lease, management agreement, authorization, or other document that permits this specific letting. Confirm any required consent to sublease and that the proposed term fits within the upstream right.
Background & legal framework
The Supreme People’s Court’s urban-house leasing interpretation addresses leases of buildings constructed without a construction-project planning permit, buildings not built according to that permit, and certain unauthorized temporary buildings. Those issues can affect contract validity. Compare the actual building and leased area with the relevant planning and construction documents; do not treat a landlord’s promise to provide permits later as proof the existing premises are regularized.
Describe the property in an attached plan. Mark the leased rooms, production bays, warehouse areas, loading zones, parking, access roads, shared corridors, yard space, and utility rooms. State how area is measured, which common areas are included, and whether the tenant has exclusive or shared use. Record the identifiers used in the ownership records and the address used by the local authority.
Test the proposed use and site capacity
Write down the actual planned operation, not just a broad label such as “manufacturing” or “storage.” Identify products, processes, machinery, shift patterns, hazardous materials, vehicle movements, and any customer or worker occupancy. Compare that use with the recorded purpose of the building and land, the landlord’s approvals, park or estate rules, and any permits the tenant will need for its own operation. The lease is not an operating license.
Inspect the site with the people responsible for engineering, operations, safety, and logistics. Confirm floor loading, clear height, floor flatness, dock geometry, crane or lift capacity, electrical supply and upgrade path, water and drainage, gas, ventilation, waste handling, internet, fire systems, emergency exits, and truck access. Record the tests, responsible party, known limits, and any work that must be completed before rent or production begins. For a warehouse, map sprinklers, racking clearances, fire compartments, loading arrangements, and the approved storage use.
How the dispute was handled
Request the building’s construction and fire-safety records and identify who is responsible for maintaining the shared systems. Local requirements may depend on the city, building class, and planned activity. Confirm the applicable filing, inspection, and permit route with the competent local authorities before committing to a fit-out schedule.
Make delivery a documented event
The Civil Code requires the lessor to deliver the leased property as agreed and maintain it in condition for the agreed use. It also places repair duties on the lessor unless the parties agree otherwise. Translate those rules into an inspection and handover process: the date, acceptance criteria, outstanding defects, access cards and keys, meter readings, utility tests, equipment inventory, manuals, and safety information.
Attach dated photographs and a joint condition report. List visible cracks, water intrusion, roof leaks, damaged doors, floor defects, existing contamination indicators, nonworking equipment, and incomplete construction. Allocate responsibility and deadlines for each item. Specify whether rent begins on physical handover, after agreed repairs, or after a defined test, and what happens if a critical item fails. Keep evidence that both parties received and accepted the handover record.
Control fit-out, repairs, and shared systems
Obtain written consent before installing production lines, heavy equipment, partitions, exhaust systems, tanks, racking, cabling, signage, or other improvements. The Civil Code allows a tenant to improve or add fixtures with the lessor’s consent; without consent, the lessor may require restoration or compensation for loss. The contract should therefore list approved plans, approval deadlines, permit responsibilities, contractor access, utility shutdowns, insurance, ownership of fixtures, and the treatment of each improvement at expiry or early termination.
Practical implications
Separate structural and base-building repairs from tenant maintenance, routine servicing, and damage caused by the tenant. Identify response times for urgent failures and how the parties will document notice, inspection, work, and cost. For shared fire, power, water, access, and drainage systems, identify the building manager, shutdown notice, emergency contact, cost-allocation method, and the tenant’s right to inspect relevant maintenance records.
Set a clear return standard and local filing plan
Describe the required condition at return by reference to the handover report. Distinguish ordinary wear from damage, identify fixtures that remain, state which tenant equipment must be removed, and set a procedure for inspection and disputed items. The Civil Code provides for return of the property in the condition agreed or consistent with use according to its nature. Avoid relying only on a phrase such as “restore to original condition” when the parties have not documented the original condition or agreed how approved improvements will be treated.
Use a written lease for a term of six months or more and state the premises, purpose, term, rent, payment dates, repair allocation, utilities, access, subletting, default, and handover and return procedures. The Civil Code caps a lease term at twenty years; any excess is ineffective. The Urban Real Estate Administration Law also calls for a written lease and registration for record. The Civil Code and the Supreme People’s Court interpretation state that a failure to file the lease, by itself, does not make the contract invalid; still check the local filing process and deadlines for the property and transaction.
Pre-signing checklist
- Match the lessor’s identity, authority, property records, site plan, and any sublease consent.
- Compare the actual building and leased area with planning and construction documents, including temporary-building status.
- Define the tenant’s process and verify that site use, utilities, access, and safety arrangements can support it.
- Record condition, measurements, utility tests, defects, equipment, photos, and the exact delivery date.
- Approve fit-out drawings in writing and allocate permits, repairs, fixture ownership, restoration, and removal.
- Check local lease-registration requirements and keep the filed contract and receipt with the site records.
Primary sources include the Civil Code, the Supreme People’s Court’s interpretation on urban house lease disputes, and Article 54 of the Urban Real Estate Administration Law. The applicable land, construction, fire-safety, environmental, and lease-filing requirements should be confirmed for the specific site and planned use.